USDOT · PHMSA LNG Standards & Regulatory Vault

49 CFR Part 193 · Section 508 Zero-Install IDE

Pipeline and Hazardous Materials Safety Administration · Incorporated-by-Reference (IBR) Consensus Standards Repository & MARC21/RFID Library

Active Clause: 49 CFR § 193.2051 & § 193.2057Call #: MARC21: TP761.L5 N47 2001
Interactive 49 CFR Part 193 Engineering Cross-Walk

LNG Peak-Shaving & Marine Export Facility Safety Schematic

1,600 Btu/ft²-hr (5 kW/m²) THERMAL EXCLUSION ZONE (§ 193.2057)VAPOR DISPERSION EXCLUSION ZONE½ LFL (2.5% CH4) · DEGADIS / PHAST (§ 193.2059)THERMAL RADIATION IMPOUNDMENT BASIN (110% VOL)FULL-CONTAINMENTLNG STORAGE TANKAPI 620 APP Q (-260°F)CRYOGENIC TRANSFER PIPING1234
49 CFR § 193.2051 & § 193.2057 · NFPA 59A (-260°F (-162°C) Spill Pool)3/4 Hardcopies · 18 DRM Seats

49 CFR § 193.2057(a): Each LNG container and LNG transfer system must have a thermal exclusion zone computed in accordance with Section 2.2.3.2 of NFPA 59A (2001) with a wind speed producing the maximum exclusion distance.

MARC21: TP761.L5 N47 2001 · Control #ocm48192044
Multi-Edition Regulatory & Consensus Standard Diff Engine

Side-by-Side Edition Redline Diff (`NFPA 59A 2001 vs. 2019 Edition` & IBR Set)

ENFORCEABLE IBR BASELINE2001 Edition (49 CFR § 193.2013 IBR Baseline)

NFPA 59A (2001) § 2.2.3.2: Thermal radiation distances shall be calculated using deterministic incident flux limits of 1,600 Btu/ft²-hr (5 kW/m²) at the property line that can be built upon, and 3,000 Btu/ft²-hr (9 kW/m²) for offsite congregation areas.

UPDATED EDITION REDLINE DIFF2019 Edition (QRA & Pool Fire Radiative Flux Model)

NFPA 59A (2019) § 5.3.2 & Chapter 19: Retains deterministic 1,600 Btu/ft²-hr (5 kW/m²) property-line threshold while adding validated solid-flame / PHAST radiative atmospheric transmissivity models and Chapter 19 Quantitative Risk Assessment (QRA) individual risk contours (10⁻⁵ / yr).

PHMSA Field Inspection & Siting Review GuidancePHMSA Interpretation #PI-23-0014 · Sandia Report SAND2004-6258

Inspectors auditing Marine Export and Peak-Shaving facilities must verify whether a Special Permit or Letter of Design Approval authorizes 2019 QRA contours over the baseline 2001 deterministic table.

DRM Policy: Zero-Plugin HTML5/PDF.js · Dynamic SDO WatermarkShelf: PHMSA HQ East Bldg (Washington, DC) · Vault Stack B-14

PHMSA Regional Digital DRM Reads vs. Physical RFID Circulation

COUNTER Release 5.1 digital standards telemetry and physical MARC21 barcode loans across PHMSA regions

COUNTER R5.1
SDO License Compliance: NFPA · API · ASME · ASCE0 Concurrent Seat Overflows

Integrated Physical Library MARC21 & RFID Circulation Desk

Click any volume to toggle physical RFID checkout status or inspect MARC21 bibliographic holdings

RFID-PHMSA-0049182 · TP761.L5 N47 2001Checked Out
NFPA 59A (2001 IBR Baseline + 2019 Redline Compendium)
Southwest Region (Houston LNG Inspection Team) · Senior General Engineer (GS-0801-14)Due Nov 18, 2026 · Barcode Verified
RFID-PHMSA-0051209 · TA660.T34 A65 2009Active DRM Seat
API Standard 620 (11th Ed Appendix Q Cryogenic Tanks)
PHMSA HQ (Office of Pipeline Safety — Engineering) · Cryogenic Structural SpecialistConcurrent Seat #14 of 25 Active
RFID-PHMSA-0050344 · TJ930 .A48 2004On Shelf (HQ Vault)
ASME B31.3 Process Piping Code (2004 IBR Baseline)
Southern Region (Sabine / Elba Island Audit Prep) · Pipeline Safety InspectorAvailable for Field Kit Checkout
Z39.50 / SRU Library of Congress Cataloging Sync ActiveISO 18000-3 RFID Ready