NOAA OMAO|PAE Platforms · Ship Division
Owner's Representative DI Correspondence Portal
Silver Spring, MD · Concurrent Major Vessel Acquisitions · Google Drive Hybrid-Sync

Unified Technical Submittal Oversight From Shipyard Intake to Long-Term Archive.

Coordinate parallel naval architecture SME reviews, paste high-resolution CAD & Navisworks snips, enforce the Program Manager Formal Release Gate, and synchronize finalized Data Items directly into NOAA's Google Drive and Sidecar Sheets with zero spreadsheet administration.

Internal Government View Active: Showing all Internal Gov Draft SME comments, side-by-side Lead edits, and SME author lineage prior to PM release.
NOAA Naval Architecture Scantling & 3D Hull Piping Oversight
Active Fleet Portfolio: 3 Major Acquisitions306 Master DIs
14-Day
Gov Review SLA
<3.2s
Drive Hybrid-Sync
100%
Sheets Exit Ready
Concurrent Ship Acquisition Selector

Select Active Vessel Program or Search Full-Text Engineering Repository

LATEST SUBMITTAL: Issue 0001 · R01 (Rev B)Partial Approval (82% Closed · 2 Unresolved Carried Forward)

DI-027: Midship Scantling & Transverse Frame Plan (Frames 36–74)

File: NOAAS-OCN_DI-027_Iss0001_R01_RevB_Midship_Scantlings.dwg (184.6 MB (14 Layout Sheets))

Hierarchical Approval Chain & Formal Release Gate

Parallel SME comments reconcile through the Discipline Lead and SDM before the Program Manager executes a single bundled Shipyard release.

TIER 1 · PARALLEL SMEsCompleted
Subject Matter Experts (Parallel Hull, Acoustics & Welding)
M. Kowalski · R. Takahashi · E. Vance
Verified: 2026-11-11 16:40 EST
TIER 2 · ENG LEADCompleted
Engineering Lead Technical Back-Check & Reconciliation
Dr. Hannah Lindqvist, PE (Structural Lead)
Verified: 2026-11-13 17:05 EST
TIER 3 · SDMIn Review
Ship Design Manager Strategic Alignment
M. Callahan, PE (PAE Ship Design Manager)
TIER 4 · PM GATEAwaiting Prior Tier
Program Manager Formal Authorization & Shipyard Release Gate
W. Halvorsen (PAE Ship Program Manager)
Iterative Commenting, CAD Snips & Shipyard Dialogue Loop

Tabular Comment Ledger for DI-027 (3 Visible Rows)

CMT-027-004Formally Released Position
Sheet 04 · Zone B-6 · Frame 48 Gondola Bracket
Carried Forward Open from Rev R0 (9 of 10 R0 Comments Closed -> 90% Partial Approval)
R50 SOFT-TOE REQFR 48 · AH36 16.5mm · SHT 04
AutoCAD Sheet 04 Snip — Frame 48 Gondola Bracket Soft-Toe Stress Concentration
SME Originator: M. Kowalski (ABS Hull Structural SME) · Reconciled by Dr. Hannah Lindqvist, PE (Hull Lead)

Per Contract Spec Section 114.2 and ABS Rules Pt 3, Ch 2, revise Frame 48 multi-beam gondola transition bracket from a 15mm snipe to a 50mm radiused soft-toe bracket with 100% UT-inspected CJP weld prior to unit erection.

Logged: 2026-09-27T14:12:04Z · Dialogue Turns: 3
Side-by-Side Digital Thread Lineage (Preserved in 5-Year Long-Term Archive)
1. ORIGINAL SME DRAFT (M. Kowalski (ABS Hull Structural SME))

Toe radius at Frame 48 multi-beam sonar gondola transition bracket is drawn as sharp 15mm snipe; this will crack under North Pacific slamming loads. Make them put a 50mm soft-toe gusset with full-penetration ultrasonic weld.

2. LEAD RECONCILED (Dr. Hannah Lindqvist, PE (Hull Lead))

Per Contract Spec Section 114.2 and ABS Rules for Building and Classing Marine Vessels Pt 3, Ch 2, revise the Frame 48 multi-beam gondola transition bracket from a 15mm snipe to a 50mm radiused soft-toe bracket with 100% UT-inspected CJP weld.

3. PM RELEASED POSITION (Locked ID CMT-027-004)

Per Contract Spec Section 114.2 and ABS Rules Pt 3, Ch 2, revise Frame 48 multi-beam gondola transition bracket from a 15mm snipe to a 50mm radiused soft-toe bracket with 100% UT-inspected CJP weld prior to unit erection.

Official Government <-> Shipyard Correspondence Loop (Unlimited Pre-Revision Turns)
NOAA Government · PAE Platforms Formal Position (DI-027 R0 Bundle)2026-10-02T17:05:00Z

Issued formally on R0: Provide 50mm soft-toe radius at Frame 48 sonar gondola bracket and specify 100% ultrasonic testing (UT) on the flange termination.

Shipyard Coordinator · J. Broussard (Thoma-Sea Hull Engineering)2026-10-16T11:24:33Z

Shipyard Counter-Comment: In R01 Sheet 04 we increased bracket plate thickness from 14mm to 18mm AH36, but kept a 25mm snipe to clear the 150mm bilge ballast suction pipe penetration.

NOAA Government · PAE Platforms Back-Check (Dr. H. Lindqvist)2026-11-06T15:09:12Z

Government Back-Check Disposition: Non-concur with 25mm snipe. Offset ballast pipe collar 65mm inboard or install collar doubler ring so full 50mm fatigue radius is preserved. Comment remains OPEN in R01.

CMT-027-011Internal Gov Draft (Hidden from Shipyard)
Sheet 09 · Zone D-3 · Wet Lab Deck Girder Insert
R50 SOFT-TOE REQFR 48 · AH36 16.5mm · SHT 04
Internal SME Draft Markup — Wet Lab A-Frame Foundation Bolt Circle Verification
SME Originator: R. Takahashi (Acoustic & Vibration SME) · Reconciled by Dr. Hannah Lindqvist, PE (Hull Lead)

Verify bolt-circle alignment between Sheet 09 A-frame winch foundation insert plate (DH36, 20mm) and Vendor Furnished Information drawing VFI-309 Rev A (+/- 2mm tolerance). [Held in Government Drafting Gate awaiting PM release]

Logged: 2026-11-11T10:21:44Z · Dialogue Turns: 1
CMT-027-002Formally Released Position
Sheet 02 · General Notes · ABS Ice Class D0 Weld Schedule
Resolved & Verified in Rev R01 (9 of 10 R0 Comments Closed)
R50 SOFT-TOE REQFR 48 · AH36 16.5mm · SHT 04
Verified R01 Weld Table Note 7 — Low-Hydrogen Consumable Added
SME Originator: E. Vance (Welding & NDE SME) · Reconciled by Dr. Hannah Lindqvist, PE (Hull Lead)

Update Sheet 02 Weld Schedule Table 2.1 to specify AWS E7018-H4R low-hydrogen consumable for all ABS Ice Class D0 ice-belt shell seams.

Closed by Dr. H. Lindqvist on 2026-11-10T14:02:11Z (Verified on R01 Sheet 02)
Logged: 2026-09-26T08:50:19Z · Dialogue Turns: 1